Entering the multi-megawatt class: Meppen Helte Wind Farm

In 2000, ENOVA entered the multi-megawatt class with the installation of the Meppen-Helte wind farm. Six ENERCON E-66 turbines 1800 kW / 70 meter rotor diameters, 98 meter hub heights, concrete towers, and 4.6 hectares area. The annual energy production is approximately 19.4 million kWh and the total investment was at the time about 27.09 million German Marks.

» Commissioned: 2000
» Number of units: 6
» Annual energy production: approx. 19.4 million kWh
» Total investment: 27.09 million German Marks