Meppen Teglingen Wind Farm

Since 2001, six ENERCON E-66 turbines have been located on 4.6 hectares close to the villages of Teglingen and Helte in Meppen. The 1800 kW turbines have 70 meter rotor diameters, hub heights of 98 meters, and concrete towers. The annual energy production is approximately 19.7 million kWh. The manufacturer guarantees a 98 percent turbine availability. An average payout of 15.1 percent over the lifetime with a cumulative payout of 317 per cent on the investment amount means a high capital growth.

» Commissed: 2001
» Number of units: 6
» Annual energy production: approx. 19.7 million kWh
» Total investment: 27.5 million German Marks