Innovative single turbine: Ettingschloot Neermoor

The ENOVA wind turbine Ettingschloot Neermoor is the first repowering project in the district of Leer. Located in Moormerland, the turbine is an ENERCON E-66/20.70 with 2000 kW, a 70 meter diameter, 65 meter hub hight, and a steel tower. With an average payout of 13.4 percent over the lifetime and a cumulative dividend of 275.6 percent on the investment amount, this can be considered high capital growth.

» Commissioned: 1994
» Repowering: 2004
» Number of turbines: 1
» Annual energy production: approx. 3.7 million kWh
» Total investment: approx. 2.5 million euros