Repowering Memgaste

This year in the municipality of Moormerland, a wind turbine built in 1992 by ENOVA was repowered. The site is located in the northern district of Leer and is one of the oldest wind energy projects in ENOVA’s portfolio.

Repowering replaces the existing wind turbine with a newer and more powerful one. The site’s yield can thus be optimized and the Memgaste wind turbine’s energy output is tripled. The old system, Type Icon M 530 had a rated output of 250 KW and a hub height of 30 meters. Its rotor diameter was 26 meters. In its place is now an Enercon E-53 with a rated output of 800 KW, a hub height of about 73 meters, and a rotor diameter of 52.9 meters.
In October, the tower parts for the wind turbine were delivered and quickly installed. The final assembly of the enclosure, hub, and rotor blades was completed in November of this year. In December, the wind power plant was put into operation.

For ENOVA, Memgaste is the third successful repowering project, in addition to a single system in Neermoor and the Holgaste Wind Farm.